wwwww.1视频I久久女教师I亚洲精品人防在线I日韩色小说I久久一区二区三区四区五区I鲁一鲁在线视频I久热国产视频I夜夜爽妓女77777毛片A片I精品一区一区三I97在线b'bI97色亚洲I91国内精彩视频I亚洲黄频I亚洲AV产在线精I日韩不卡

Location:Home / News

News

Industry News

Siemens installs final turbine at 144-MW wind farm in Dutch waters

Time:02 Mar,2016
Rotor blade installation at Westermeerwind wind farm. Source: Westermeerwind Mar 1, 2016 12:07 CET by Ivan Shumkov March 1 (SeeNews) - German industrial major Siemens (FRA:SIE) has finished installing the last of the 48 wind turbines that make up the 144-MW Westermeerwind wind farm in Dutch waters. The plant will now undergo a testing period, the project company said in a press release on Tuesday. The installation of the foundations, cables and turbines took one year, as planned. The Westermeerwind facility is part of a larger complex, called Noordoostpolder Wind Farm, which consists of 86 wind turbines erected both in the water and on land along the dikes of the IJsselmeer freshwater lake. “At this time Westermeerwind Wind Farm is the largest wind farm in the Netherlands,” said Anne de Groot, director of Westermeerwind. Siemens built the wind park as the main contractor and will also maintain the facility for at least 15 years. Eneco will buy the plant’s output.
2017 © SUFUL bearing.ALL Right Reserved
logo